Training Dates

  • 4/22: 8-12 (Project Selection)
  • 5/6: 8-1 (Define)
  • 5/20: 8-1 (Measure)
  • 6/3: 8-1 (Measure/Analyze)
  • 6/24: 8-1 (Analyze)
  • 7/8: 8-1 (Improve)
  • 7/22: 8-1 (Control)
  • 8/5: 8-1 (Report Outs)